Puerta Alicante Carrefour Shopping Centre – Alicante
Date: 2001
Type of work: Building
Alsina systems were used for the structure of the 120,000 m2 of slabs required for the project. An Alucubetas temporary formwork system with permanent coffers was used, with a 12 cm rib and centre-to-centre distance of 80 cm. Our slab system perfectly meets the needs of the market, offering a good finish and, above all, quick and easy assembly. These features have the advantage of using Alucubetas and making the most of the formworking processes.
Alsina systems:
Alucubetas,
A3 post-shore,
Alisan panels,
A3 post-shore