C-240 Climbing System

1
Climbing platform with a wide 0.75 m passage for auxiliary work

Element designed to climb the wall formwork for concrete fillings up to heights of 6 m ensuring total safety for workers. It can be positioned with either of two anchoring systems: using M-24 tie bars or using metal cones with ties set in the concrete.

JOSE - trepantes

Climbing systems are a great challenge: contact us to find the best solution!

CONTACT

Properties

  • 2.4 m wide platform.
  • For formwork heights up to 6 m.
  • Platform length for 3 linear m of formwork.
  • Designed to withstand a range of wind loads at any height.
  • Platform designed to support 2 kN/m2 in addition to the weight of the formwork.
  • Formwork removal system using a cart on wheels.
  • It has a wide and safe lower platform.
  • It enables transporting the formed set with the platform and the formwork without disassembling it.
  • Stripping does not require workers to be on the platform.

Components and accessories

  • Auxiliary platform for anchor recovery.
  • Aligners and extensions for high perimeter protection.

Frequent uses

  • High columns.
  • Digesters.

Projects

Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

La Paloma Biomethanisation Plant
La Paloma Biomethanisation Plant

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Industrial flour mill in Philippines
Industrial flour mill in Philippines

Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales

Industrial silos in Torres Vedras
Industrial silos in Torres Vedras

Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon

Sewage Treatment Plant Thomas P. Smith
Sewage Treatment Plant Thomas P. Smith

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Wastewater Treatment Plant (WWTP) in Ibiza (Spain)
Wastewater Treatment Plant (WWTP) in Ibiza (Spain)

This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.

Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Andra Pradesh Dam
Andra Pradesh Dam

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).

Contact
1
need help? call us!

(+632) 834 7553

Unit 901, The Infinity Tower
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title: