Alisply Vault Dome Formwork
Formwork system to execute with circular vaults with radius from 2.50 m and pressures up to 60 kN/m2, handled by crane. The system’s horizontal formwork consists of pre-assembled panels with an electrolytic zinc-plated steel frame and an 18 mm thick phenolic plywood formwork surface. Vertical support is done with the Alsina multidirectional modular shoring system, the high load capacity of which (up to 80 KN per vertical) is safe for heavy load requirements.
Are you looking for a solution for your slabs? We Alsina are at your disposal!
DOWNLOADs
Components and accessories
- Pre-assembled Alisply Circular modules.
- Alsina multidirectional vertical shoring system.
- Resistant Multiform elements for Civil Works as supports for the roofing formwork.
- Alsina transportation trolley.
Frequent uses
- False tunnels.
- Boreholes for mining tunnels.
Properties
- The roofing formwork is made up of factory assembled, extra flat, 15 cm modules that do not require special tools for assembly.
- The joining and alignment of the roof panels is done by means of a clamp that can be handled without tools, streamlining assembly on site.
- Multiform beams support the roofing formwork and release onto the vertical support.
- The vault’s vertical support is ensured thanks to the high load-bearing capacity of the multidirectional shoring system joint (up to 80 KN with verticals of 1.5 m and safety coefficient of N=2).
- The roofing system is always assembled from below, avoiding unnecessary risks for workers who do not need to walk on the formwork surface.
- Alsina’s supplemental offsetting components, which are connected to the panel, guarantee the proper geometric fit for the roofing formwork.
Projects
Waste Treatment Plant in France
Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)
Alsina Romania participated in the construction of an important residential complex in Bucharest.
Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa
Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain
Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales
Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon
Alsina USA participated in the construction of a food industry plant that consists of large salmon farms in Homestead city (Miami)
Alsina Portugal implemented the execution of several deposits,which involved a great technical difficulty due its revolution’s hyperboloid shape.
Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States
Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.
Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.
Alsina’s Formwork delegation in Peru collaborated in the construction of a planned city in Peru, through the execution of the 4 elevated water tanks.
This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.
Alsina’s Formwork delegation in Panamá participated in the construction of the second module of the sewage treatment plant of a wastewater treatment plant.
It is the second of its kind in the metropolitan area of the city of Medellín.
The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.
Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).
Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.
Alsina collaborated in the construction of the road linking Las Palmas with the town of La Aldea.
Alsina Uruguay collaborated in the execution of a new viaduct over the Rambla Portuaria in Uruguay.
Alsina Formwork collaborated in the construction of the A-33 Highway section way between Jumilla and Yecla in Spain.
The Benta Berri station is a railway station located in the old neighborhood of San Sebastián.
(+632) 834 7553
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines