Scroll Top

Alisply Vault Dome Formwork

1
Economical and fast option for false tunnels

Formwork system to execute with circular vaults with radius from 2.50 m and pressures up to 60 kN/m2, handled by crane. The system’s horizontal formwork consists of pre-assembled panels with an electrolytic zinc-plated steel frame and an 18 mm thick phenolic plywood formwork surface. Vertical support is done with the Alsina multidirectional modular shoring system, the high load capacity of which (up to 80 KN per vertical) is safe for heavy load requirements.

JUNIOR - horizontales 1

Are you looking for a solution for your slabs? Contact us to discuss further!

DOWNLOADs

Components and accessories

  • Pre-assembled Alisply Circular modules.
  • Alsina multidirectional vertical shoring system.
  • Resistant Multiform elements for Civil Works as supports for the roofing formwork.
  • Alsina transportation trolley.

Frequent uses

  • False tunnels.
  • Boreholes for mining tunnels.

Properties

  • The roofing formwork is made up of factory assembled, extra flat, 15 cm modules that do not require special tools for assembly.
  • The joining and alignment of the roof panels is done by means of a clamp that can be handled without tools, streamlining assembly on site.
  • Multiform beams support the roofing formwork and release onto the vertical support.
  • The vault’s vertical support is ensured thanks to the high load-bearing capacity of the multidirectional shoring system joint (up to 80 KN with verticals of 1.5 m and safety coefficient of N=2).
  • The roofing system is always assembled from below, avoiding unnecessary risks for workers who do not need to walk on the formwork surface.
  • Alsina’s supplemental offsetting components, which are connected to the panel, guarantee the proper geometric fit for the roofing formwork.

Projects

Clear Filters
Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

False tunnel in Rzeszów
False tunnel in Rzeszów

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)

Confort urban residence
Confort urban residence

Alsina Romania participated in the construction of an important residential complex in Bucharest.

Cerro Verde Mining Project Treatment Plant
Cerro Verde Mining Project Treatment Plant

Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa

Contact
1
need help? call us!

(+632) 834 7553

Unit 1515 & 1516, High Street South Corporate Plaza Tower 1.
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title:

    *Required fields