VISTAFORM TABLE

1
Economy and simplicity for the assembly of large surfaces

Highly versatile horizontal formwork system adaptable to a great variety of shapes for the execution of slabs. It is a modular system which, by combining the different measures of the wooden beams, allows a variety of dimensions. The possibilities of different shoring systems adapt the system to the vast majority of situations.

JUNIOR - horizontales 1

Are you looking for a solution for your slabs? We Alsina are at your disposal!

CONTACT

DOWNLOADS

Frequent uses

  • Shopping centres.
  • Residential buildings.
  • Parking lots.

Properties

  • Multiple uses available due to the HT-20 beam’s variety of sizes.
  • Easy and simple assembly due to the connection system.
  • Different shoring possibilities depending on load and height: shoring system, prop with folding or fixed head, prop with brace frame.
  • It incorporates safety elements to protect workers on site.
  • Cantilever tables for the slab edge.
  • Possibility to choose the quality of the lining based on need.

Components and accessories

  • Crane hook for vertical transport.
  • Horizontal transport accessory for stripping and transport.
  • Built-in safety features to protect workers on site.

Projects

Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

La Paloma Biomethanisation Plant
La Paloma Biomethanisation Plant

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Barcelona’s Port Extension
Barcelona’s Port Extension

Alsina collaborated in the construction of a submerged mooring at ​​the Civil Guard area in the Port of Barcelona.

Port of Alicante extension
Port of Alicante extension

Alsina’s Formwork delegation in Alicante collaborated in the extension of pier number 13 of the Port of Alicante (Spain)

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Juan Díaz Wastewater Treatment Plant Extension
Juan Díaz Wastewater Treatment Plant Extension

Alsina’s Formwork delegation in Panamá participated in the construction of the second module of the sewage treatment plant of a wastewater treatment plant.

Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

University of Pisa
University of Pisa

The structure of the New Guidotti Educational Center of the University of Pisa.

Contact
1
need help? call us!

(+632) 834 7553

Unit 901, The Infinity Tower
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title: