Scroll Top

Arcisate-Stabio railway

1
Tunnels and Bridges
WE HAVE high-resolution capability to effectively address the needs of all our customers.

Alsina Italy has successfully participated in the construction of the Arcisate-Stabio railway line, a new railway line that will connect Switzerland to Malpensa airport (Italy).

Once again Alsina’s engineering department has been able to provide an ideal solution to build such a complex structure. The directions given by the construction management regarding performance, safety and different phases of the project have been successfully fulfilled by the Alsina Italy team.

With a length of 8 km, the new railway is made up of railway trenches and tunnel pieces: in particular, Alsina has contributed to Gladden station, on the border between Italy and Switzerland, the building of the GA03 tunnel to Induno Olona, all the water traps and several retaining walls along the route.

More specifically, the Alsina equipment has made it possible to resolve the countless technical difficulties of the GA03 tunnel Induno Olona, ​​which is 60 meters long. The Alsina equipment made it possible to meet the high production rates required by the customer. With the AR-80 Shoring System it was possible to support the trusses that allow the continuous circulation of means of transport in its lower part, and it was resolved with the Multiform Bridges System by the particular shape of the vault.

The Multiform system, consisting of double UPN metal beams and wooden beams, is one of Alsina’s most versatile systems, allowing “ad hoc” design of any type of recoverable formwork to implement slab, piles and pillars formwork of all geometries, as well as straight walls, curved walls, one-side walls, bridge decks and climbing elements.

Finally, formwork stripping was carried out using manual lathes operated from above the formwork structure. This allowed very fast recovery, providing total safety for the workers during this procedure.

Gladden station has got a slab of approximately 1,000 square meters 1 m thick, and 8 meters high from the ground. This template was carried out with the CL-40 Shoring System, with a technical solution optimized to suit the customer’s budget.

The timely completion of the project, the technical optimization of the system and the constant presence and support of Alsina have allowed our customers to meet the pre-set production and safety goals.

Project Details
Place:
 Italia
Category:
Tunnels and Bridges
Products:
Multiform Bridges, AR Shoring System, CL Shoring System, Vistaform Slabs

ALSINA SYSTEMS

Multiform for bridge decks
AR Shoring
Vistaform Slabs
CL Shoring

RELATED PROJECTS

Clear Filters
Toll road in Southeast Asia
Toll road in Southeast Asia

Alsina’s Formwork delegation in Asia collaborated in the construction of a major toll road in Southeast Asia.

False tunnel in Rzeszów
False tunnel in Rzeszów

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)

Railway Project
Railway Project

Alsina’s subsidiary in Morocco collaborated in the works of the Casa Kenitra railway.

Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

Contact
1
need help? call us!

(+632) 834 7553

Unit 1515 & 1516, High Street South Corporate Plaza Tower 1.
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title:

    *Required fields