Bello Wastewater Treatment Plant
1
Water Treatment
WE accumulate experience of more than 500 water infrastructures projects worldwide.
This plant is the second of its kind in the Medellín metropolitan area, and will have a larger scope than the first. It is also within the sanitation program for the Medellin River and its tributary streams.
This plant is the largest, both in size and capacity, in Colombia.
For its construction, the full sum of our systems and equipments for horizontal, vertical, and special (Mecanoflex, Alisply, Alisply circular, Alispilar, AR80, Multiform) formworking has been supplied, as well as our safety systems, and consultancy for structuring and design.
Project Details
ALSINA SYSTEMS
RELATED PROJECTS
Contact
1
need help? call us!
(+632) 834 7553
Unit 1515 & 1516, High Street South Corporate Plaza Tower 1.
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines