Scroll Top

Novaliches Balara Aqueduct nº 4

1
Water Treatment
WE accumulate experience of more than 500 water infrastructures projects worldwide.

For the past years, water resources in the Metro Manila area have been one of the greatest concern in the coming years. In order to meet this growing demand, Manila Water entered in a 5.5B pesos contract with Novabala Joint Venture to construct Novaliches-Balara Aqueduct No.4. This project aims to deliver 1,000 MLD to treatment plants and into Metro Manila.

This project is situated in Quezon City, Philippines, and it consists in the construction of a 6.4 km long tunnel which was built thanks to the use of a TBM. The tunnel will allow, as part of the AWTIP (Angat Water Transmission Improvement Project) project, the transfer of water from the Ipo basin to at the Bigte Settlement Plant.

Alsina Philippines took part in this groundbreaking project by providing formwork in various parts of the project.

Alsina provided formwork for the Intake Tower and Outlet Shaft using Alisply Circular, AR Shoring, Multiform Decking and Multiform Climbing System.

The intake tower reaches up to a height of almost 29m with an interior diameter of 6m. Both Interior and Exterior Panels are supported by the Multiform Climbing Formwork System while on the interior side, additional AR Shoring were provided to add working areas for the contractor.

The outlet shaft is a structure that reaches up to a total of 52m height with an interior diameter of 8m. Like for the intake tower, Alisply Circular Formwork Panels were also supported by the Multiform Climbing System.

Aside from the Intake Tower and the Outlet Shaft, Alsina Philippines has also provided formwork solution for the Pag-asa Retaining Walls using Alisply Wall Panels and C160 Climbing System. This is a buttress-type of retaining wall. This wall had a tapered wall thickness of 1.17m at the base up to 0.40m at the top. The height of the wall was up to 10.12m.

The project has been completed and Alsina Philippines has provided the necessary technical design and site support they need ensuring timeliness of delivery.

Concrete finishes and transition of systems needed are achieved making the client’s job more efficient.

 

RELATED PROJECTS

https://www.alsina.com/en-sea/projects/valenzuela-wastewater-treatment-plant/

https://www.alsina.com/en-sea/projects/unionbank-innovation-campus/

https://www.alsina.com/en/projects/sister-grove-regional-water-resource-recovery-facility/

https://www.alsina.com/en/projects/juan-diaz-wastewater-treatment-plant-extension/

Project Details
Place:
Manila, Philippines
Category:
Water Treatment
Products:
Alisply Circular, AR Shoring, Multiform Decking, Multiform Climbing System, Alisply Wall, C160 Climbing System

ALSINA SYSTEMS

RELATED PROJECTS

Clear Filters
Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

Water Tower Outeiro
Water Tower Outeiro

Alsina Portugal implemented the execution of several deposits,which involved a great technical difficulty due its revolution’s hyperboloid shape.

Sewage Treatment Plant Thomas P. Smith
Sewage Treatment Plant Thomas P. Smith

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Contact
1
need help? call us!

(+632) 834 7553

Unit 1515 & 1516, High Street South Corporate Plaza Tower 1.
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title:

    *Required fields