Corbel 500 KN
High-load capacity support corbel for formworking lintels, bridge piers and high slabs, without the need for scaffolding towers. Allows for the system to be unloaded and leveled, enabling assembly and disassembly of the formwork.

Climbing systems are a great challenge: contact us to find the best solution!
DETAILS

DOWNLOADS
Properties
- Use of the pre-tensioned 38 mm Dywidag rod by means of a manual hydraulic equipment, guaranteeing the correct union between the corbel and the concrete facing.
- With the set made up of the wedge and unloading guide, the formwork and the unloading system can be leveled, thus enabling the assembly and disassembly of the supporting structure.
- The system is completed with a set of HEA-600 beams of various sizes: 3 meters, 12 meters and 15 meters.
- Some of their most frequent uses are high slabs, bridge piers and lintels.
Common uses
- High slabs.
- Bridge piers.
- Lintels.
Projects

Alsina Romania participated in the construction of an important residential complex in Bucharest.

Alsina USA participated in the construction of a new residential building in the town of Fort Lauderdale (Florida).

Alsina’s formwork delegation in Uruguay collaborated in the construction of the Alexander Boulevard apartment building in Punta del Este (Uruguay).

Alsina’s formwork delegation in Paraguay collaborated in the construction of the Jade Park Residential Complex in the city of Asunción

The project consists of the construction of an apartment building in the first line of the Caribbean Sea in the hotel zone of Cancun.

Alsina España Cataluña participated in the construction of a residential complex in the city of Badalona (Barcelona).

Alsina’s Formwork delegation in Santiago de Chile collaborated in the construction of the Las Lilas II Residential Complex in the city of Renca.