I2-I69C Interchange project
This project includes 5 additional bridges between San Juan, Pharr and McAllen in Texas, lateral roadways, retaining walls, entrances and exists.
It has been executed 100% with Alsina Formwork for all the Structures: Monocolumn, Multicolumn and Straddle Bents, Abutments, Retaining Walls, Bridges widening among others, Alsina Formwork provided detailed drawings for Assembly and for more complex structures we also provided Stripping drawings, field service at moments when costumer requested support.
Thanks to the versatility of our formwork systems, mixing them together Alsina has been able to design every geometry the project required, for this, Alsina’s Engineering Department have been in constant and direct contact during the week with the customer and the assembly crew, to solve issues, explain our systems, and brainstorming with the on-site professionals in order to produce the best solutions as a team effort.
Many Alsina formwork systems have been used in all this project:
- Alisply Manual
- Alisply Walls
- CL-40 Scaffolding System
- AR-80 Scaffolding system
- C-160 Scaffolding System
- Aluflex
- Multiform
- Multiform tables
- Self-spanning
- Steel Round Columns
- Bridge Overhang Brackets
- Heavy Duty Support Brackets
- TC360 Heavy Duty Towers
- H33 Truss System
- HEB Beams
As the region is growing exponentially, this project will improve the connectivity and life quality of the people of these 3 cities.