Oil refinery expansion
Alsina participated in the construction of an oil refinery expansion in Spain.
The structure consists of three floors of 2407 m2 with tegular beams and a slab of 20 cm. On the first floor we had to save some 1.5 meters high forged low walls that were constantly varying the shore systems dimensions and placement. We have approximately 8425 m3 of shoring systems in each floor.
The beams formwork has been done and we have used a wood formwork system on them in order to have the slabs formwork done as well. For the second forging on the outer perimeter we have used the c-160 climbing system, because due to the placement of some generators, we have to clear the bottom space in the area.
ALSINA SYSTEMS
RELATED PROJECTS

Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa

Located in the south of Lima (Peru), the Textile Factory building is a project of great importance to the province of Lima

Alsina participated in the construction of an oil refinery expansion in Spain.

Alsina participated in the construction of two main buildings a deposit for cereal and a warehouse for grain cleaning in Italy

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales

Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon

Alsina USA participated in the construction of a food industry plant that consists of large salmon farms in Homestead city (Miami)