C-160 Climbing System

1
The system has semi-automatic anchoring, ensuring optimal safety for workers

Element designed to climb the wall formwork for concrete fillings up to a height of 4 m ensuring total safety for workers. The assembly of the climbing platform and its safety platform can be carried out on the ground, before positioning it on the wall, or by placing the walkway bracket in the anchoring rings and mounting the platform later.

JOSE - trepantes

Climbing systems are a great challenge: contact us to find the best solution!

CONTACT

DETAILS

DOWNLOADS

Components and accessories

  • Auxiliary platform for anchor recovery.
  • Aligners and extensions for high perimeter protection.

Properties

  • 1.6 m wide platform.
  • For formwork heights up to 4 m.
  • Platform length for 3 linear m of formwork.
  • Designed to withstand a range of wind stress at any height.
  • Platform designed to support 2 kN/m2 in addition to the weight of the formwork.
  • It has a wide and safe lower platform.
  • It has a work platform that is free of obstructions and a guardrail, preventing risky situations during assembly and/or formwork removal.

Frequent uses

  • Building.
  • Columns.
  • Water treatment infrastructures.

Projects

El Encanto housing complex
El Encanto housing complex

The project consists of the construction of an apartment building in the first line of the Caribbean Sea in the hotel zone of Cancun.

University of Pisa
University of Pisa

The structure of the New Guidotti Educational Center of the University of Pisa.

Amador Convention Center
Amador Convention Center

Alsina’s Formwork delegation in Panama collaborated in the construction of the Amador Convention Center, in Panama City.

Rafael Escardo Bridge
Rafael Escardo Bridge

Alsina´s Formwork delegation in Peru has collaborated in the construction of the Rafael Escardo section located in Lima.

Andra Pradesh Dam
Andra Pradesh Dam

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).

Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Valenzuela wastewater treatment plant
Valenzuela wastewater treatment plant

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Oil refinery expansion
Oil refinery expansion

Alsina participated in the construction of an oil refinery expansion in Spain.

Cerro Verde Mining Project Treatment Plant
Cerro Verde Mining Project Treatment Plant

Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa

Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

Contact
1
need help? call us!

+34 935 753 000

Pol. Ind. Pla d’en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)

    Title:

    *Required fields