Removable formwork system for concrete walls, designed to be handled by crane. Large surface areas (3 and 6 m2) can be created with minimal space between the panels due to its carefully researched reinforced steel structure. This allows the wall to have a finish without excessive imperfections.

Are you interested in a solution for your columns or walls? Please contact me!
DETAILS
Properties
- Pressure rating: 60 kN/m².
- Only two ties at 3 m in height.
- The holes for the tie bars are not in the frame, which improves the finish and allows production of sloping walls.
- Plywood drill protection with bonded PVC sleeves.
- The metal frames have a galvanized finish, and the accessories have an electrolyte zinc finish that protects against corrosion.
- Unique system for panel connection with manual clamps: Quick and tool-free installation.
- No need for aligning bars.
- Allows vertical and horizontal panels to be combined.
Components and accessories
- Aligner systems for heights up to 9 metres.
- 1-sided wall for heights up to 9 metres.
- Concreting elements and platforms.
Frequent uses
- Adaptable to all types of building and/or civil works.
DOWNLOADS
Projects

Alsina USA participated in the construction of a new residential building in the town of Fort Lauderdale (Florida).

The project consists of the construction of an apartment building in the first line of the Caribbean Sea in the hotel zone of Cancun.

Alsina’s formwork delegation in Paraguay collaborated in the construction of the Jade Park Residential Complex in the city of Asunción

Alsina’s Formwork delegation in Santiago de Chile collaborated in the construction of the Las Lilas II Residential Complex in the city of Renca.

A linear structure composed of three-story buildings, alleyways and irrigated gardens is laid over the entire site like a carpet that follows the topography.

Alsina’s Chilean delegation participated with great success in the construction of the Curicó Hospital.

Alsina’s Formwork delegation in Panama collaborated in the construction of the Amador Convention Center, in Panama City.

Alsina´s Formwork delegation in Peru has collaborated in the construction of the Rafael Escardo section located in Lima.

Alsina collaborated in the construction of the road linking Las Palmas with the town of La Aldea.

Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.

The Alsina delegation in Peru collaborated in the construction of the Vizcachas Dam, in the Quellaveco mining project in Peru.

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Alsina’s Formwork delegation in Panamá participated in the construction of the second module of the sewage treatment plant of a wastewater treatment plant.

This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Alsina’s Formwork delegation in Alicante collaborated in the extension of pier number 13 of the Port of Alicante (Spain)

Alsina collaborated in the construction of a submerged mooring at the Civil Guard area in the Port of Barcelona.

This project is based in a seawall for the expasion of the Port of Blanes, in Barcelona

Alsina USA participated in the construction of a food industry plant that consists of large salmon farms in Homestead city (Miami)

Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Alsina participated in the construction of an oil refinery expansion in Spain.

Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa

Alsina Romania participated in the construction of an important residential complex in Bucharest.

Alsina’s subsidiary in Morocco collaborated in the works of the Casa Kenitra railway.

Waste Treatment Plant in France

Waste Treatment Plant in France

The construction of the building is led by the company INSO, and is projected in a period of four years.

Several technically complex columns with angled double-sided walls in a stadium in Miami.

Alsina Spain has collaborated in the extension of the facilities of a pharmaceutical building in Madrid.

Encofrados Alsina del Paraguay has started to work on the Coastal Defense of the City of Pilar.

The Alto Támega Dam is part of an impressive Hydraulic Project consisting of 3 Dams and 3 Hydroelectric Power Plants

The Nowa Dabrowa residential building complex consists of four buildings with nine floors each and an area of more than 15,000m2 with underground garages.

Located in the South Bay (Florida), the Everglades water complex began construction in January 2021 and is now in its final stage.

Alsina collaborated in the pacification of an urban area in Oliva, in the province of Valencia (Spain)