Reinforced scaffold

1
Work at heights in a horizontal direction with total safety

Thanks to its multidirectional rosette, the Reinforced Scaffold provides a series of platforms and accesses for work at heights in complete safety, such as the placement of ironwork or formwork or the pouring of concrete on walls, as well as painting tasks on facades or related to the final finish of vertical structures.

JAVI - SAFETY

How can you make your jobsite more safe? Let’s analyze together!

CONTACT

DOWNLOADS

Frequent uses

  • Sewage plants.
  • Residential and commercial building.
  • Retaining walls.
  • Mining.
  • Tunnels.
  • Hydroelectric power stations.
  • Refineries.
  • Roads.

Properties

  • Multidirectional connection technique (8 connections in an angle) allowing quick and easy assembly.
  • Multiple sizes and a complete range of accessories for maximum flexibility.
  • It has wheels so that it can be moved horizontally and accessories for crane handling.
  • Light components easy to store on site.
  • Highly resistant and durable materials.

Projects

Spanish High-Speed Railway line
Spanish High-Speed Railway line

Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.

Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Wastewater Treatment Plant (WWTP) in Ibiza (Spain)
Wastewater Treatment Plant (WWTP) in Ibiza (Spain)

This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Contact
1
need help? call us!

+34 935 753 000

Pol. Ind. Pla d’en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)

    Title:

    *Required fields