The new generation of Class A Props with quick release and integrated safety system. Alsina, true to its commitment to research, developed a prop, the A, which brings new and significant technological improvements to the market. All of this in a prop weighing only 12 Kg. The Alsina Europrop A prop has been designed and manufactured in compliance with European standard EN 1065, certified by the prestigious German institution Sigma Karlsruhe GmbH.

What kind of prop is best for your slabs? Let’s analyze this together!
DETAILS
DOWNLOADS
Properties
- New quick, comfortable and safe release.
- Tube and body anti-separating system.
- Greater overlap between body and tube.
- Regulator with stopper for the thread.
- Safety distance against getting hands caught.
- High resistance: made of high-quality steel with greater thickness.
- High durability: less wear and tear.
Prop | Height (m) maximum / minimum | Weight (Kg) | Load (kN) |
A30 | 3.0 / 1.8 | 12.50 | 18.0 / 22.5 |
A35 | 3.5 / 2.2 | 15.50 | 18.38 / 25.0 |
A40 | 4.0 / 2.7 | 17.20 | 14.95 / 22.89 |
Components and accessories
- Tripod.
- Adaptor for inclined work with Mecanoconcept.
Frequent uses
- Solid, reticular and unidirectional slabs.
- Ideal for reusable systems that allow material savings
Projects

The Alsina delegation in Peru collaborated in the construction of the Vizcachas Dam, in the Quellaveco mining project in Peru.

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

It is the second of its kind in the metropolitan area of the city of Medellín.

Alsina’s Formwork delegation in Panamá participated in the construction of the second module of the sewage treatment plant of a wastewater treatment plant.

This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.

Alsina’s Formwork delegation in Peru collaborated in the construction of a planned city in Peru, through the execution of the 4 elevated water tanks.

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Alsina Portugal implemented the execution of several deposits,which involved a great technical difficulty due its revolution’s hyperboloid shape.

Waste Treatment Plant in France
+34 935 753 000
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)