A new viaduct for the widening of SS415 Paullese

1
WE HAVE HIGH-RESOLUTION CAPABILITY TO EFFECTIVELY ADDRESS THE NEEDS OF ALL OUR CUSTOMERS.

The new section of the highway between the Muzza Canal and the Paullo (Milan) traffic circle leading to the Tangenziale Outer East Milan toll road should be open in summer. With this part of the remodeling, the last traffic light between Cremasco and San Donato Milanese will be removed.

This is a very important infrastructure construction site to improve access to the city of Milan for travelers from the east, with positive repercussions on inbound and outbound traffic.

For the construction of the widening of the Muzza Canal viaduct, Alsina Italia supplied its formwork systems. A large quantity of Alisply Walls for the construction of the abutments and lateral walls of the new viaduct. And also the CL Shoring multidirectional system for the construction of the floors, with slabs 85 cm thick and 6 m high.

PROJECT DETAILS
Place:
Paullo, Milan, Italy
Category:
Tunnels and Bridges
Products:
Alisply Wall, CL Shoring

ALSINA SYSTEMS

Alisply Walls
CL Shoring

RELATED PROJECTS

University of Pisa
University of Pisa

The structure of the New Guidotti Educational Center of the University of Pisa.

Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

Flour Tanks
Flour Tanks

Alsina participated in the construction of two main buildings a deposit for cereal and a warehouse for grain cleaning in Italy

Circular tanks of the sewage treatment plant Trento 3
Circular tanks of the sewage treatment plant Trento 3

The brand-new Trento 3 water treatment plant will replace the current one in south Trento