Scroll Top

Andra Pradesh Dam

1
WE accumulate experience of more than 500 water infrastructures projects worldwide.

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India). It involves the execution of a series of dams along the Godavari river (district of Westavavari). For this project, approximately 30,000 m2 of formwork equipment was used.

Alsina: practical and efficient solutions for civil works   

To carry out the project, Alsina supplied its formwork systems Alisply Manual, Alisply Circular, T-160 and C-240 Climbing System and Multiform.

Alisply Manual is a modular formwork system to execute finished concrete walls, designed for use by hand or with a crane. Its strength and versatility, using standard components, make it a product capable of providing a solution in most circumstances encountered in construction.

Alisply Circular is a reusable modular formwork system   for circular walls made of finished concrete. It is a fast and cost-effective system designed to be used with a crane, consisting of a galvanized steel frame and a phenolic resin-coated plywood surface. The modules of the system come pre-assembled from the factory and during construction it is only necessary to give the required radius. The panel includes the necessary components and does not require any special tool to curve the plywood.

Project Details
Place:
Andhra Pradesh, India
Area:
30,000 m2
Category:
Dams and Pipelines
Products:
Multiform Vertical, C-240 Climbing System, C-160 Climbing System, Alisply Manual Walls, Alisply Circular Walls

ALSINA SYSTEMS

RELATED PROJECTS

Clear Filters
Vizcachas Dam
Vizcachas Dam

The Alsina delegation in Peru collaborated in the construction of the Vizcachas Dam, in the Quellaveco mining project in Peru.

Andra Pradesh Dam
Andra Pradesh Dam

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).

Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Presa Alto Támega Dam (Portugal)
Presa Alto Támega Dam (Portugal)

The Alto Támega Dam is part of an impressive Hydraulic Project consisting of 3 Dams and 3 Hydroelectric Power Plants

Contact
1
need help? call us!

+34 935 753 000

Pol. Ind. Pla d’en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)

    Title:

    *Required fields