treatment plant Trento 3

1
WE accumulate experience of more than 500 water infrastructures projects worldwide.

The brand-new Trento 3 water treatment plant will replace the current one in south Trento, serving a number of municipalities around the provincial capital for a total of 150,000 p.e., with a purification capacity of 6000 m3/h.

It is a state-of-the-art plant in terms of pollution abatement, energy saving, and environmental impact. In fact, the facility will be established underground to avoid emissions, so that pollutants will be abated by 95%. In terms of energy savingsthe byproducts of the purification cycle will be recovered into sludge through a process that produces biogas, which is also recovered to cut down on the facility’s energy needs. In addition, there are plans to install solar panels and a turbine to harness the significant flow of water that, once purified, will return to the Adige River.

The biogas cogeneration, the hydraulic turbine on the discharge of the treated water, and the solar panels will produce 4 million kWh per year, covering about 30% of the facility’s energy needs.

Alsina Italia participated in the structural casting of the latter part of the plant itself, providing its own formwork systems for the 2 digesters and 4 sludge tanks.

The digesters consist of 2 circular tanks with a diameter of 24 m and a height of about 13 m, with a frustum-shaped concrete slab and a retaining wall around its outer perimeter. The Alsiply Circular formwork system allowed the curved walls to be cast, while the slab was formworked with shoring by Multidirectional Scaffolding CL-40.

On the other hand, the 4 sludge tanks have a diameter of 14.50 m and a height of 5 m, which were created with the Alisply Circular formwork as well, in a single casting from a height.

Project Details
Place:
Trento, Italy
Category:
Water Treatment
Products:
Alisply circular, CL Shoring, Alisply Walls

ALSINA SYSTEMS

Alisply Circular
Alisply Walls
CL Shoring

RELATED PROJECTS

Bello Wastewater Treatment Plant
Bello Wastewater Treatment Plant

It is the second of its kind in the metropolitan area of the city of Medellín.

Juan Díaz Wastewater Treatment Plant Extension
Juan Díaz Wastewater Treatment Plant Extension

Alsina’s Formwork delegation in Panamá participated in the construction of the second module of the sewage treatment plant of a wastewater treatment plant.

Wastewater Treatment Plant (WWTP) in Ibiza (Spain)
Wastewater Treatment Plant (WWTP) in Ibiza (Spain)

This impressive project has been carried out by the Alsina Baleares Delegation, which consists of a complete water treatment plant, digesters, decanters, tanks and 7 control buildings.

Planned city “Nueva Ciudad de Olmos” in Peru
Planned city “Nueva Ciudad de Olmos” in Peru

Alsina’s Formwork delegation in Peru collaborated in the construction of a planned city in Peru, through the execution of the 4 elevated water tanks.

Valenzuela wastewater treatment plant
Valenzuela wastewater treatment plant

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Sewage Treatment Plant Thomas P. Smith
Sewage Treatment Plant Thomas P. Smith

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Water Tower Outeiro
Water Tower Outeiro

Alsina Portugal implemented the execution of several deposits,which involved a great technical difficulty due its revolution’s hyperboloid shape.

Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

Everglades Water complex
Everglades Water complex

Located in the South Bay (Florida), the Everglades water complex began construction in January 2021 and is now in its final stage.

Elevated reservatory of Palheiros Village
Elevated reservatory of Palheiros Village

Located in the village of Palheiros – Ourique (Portugal), the reservoir will supply the adjacent farms with drinking water.

Circular tanks of the sewage treatment plant Trento 3
Circular tanks of the sewage treatment plant Trento 3

The brand-new Trento 3 water treatment plant will replace the current one in south Trento

Contact
1
need help? call us!

+34 935 753 000

Pol. Ind. Pla d’en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)

    Title:

    *Required fields