Extension of the WWTPI
The work, which is currently underway, consists of the expansion of the EDARI (Industrial Waste Water Treatment Plant) for the company El Pozo, a reference in the sausage sector.
This work consists of several buildings and facilities, including most notably, due to their size, a new sludge reception tank and a bio-methanization digester.
Both facilities have a circular floor plan and a great height: 9 meters for the first one and 18 meters for the second one.
The company has invested more than 12 million euros in different actions for the treatment of waste water and the reduction of atmospheric emissions through energy recovery.
The following formwork systems have been used to provide a solution: C240 Climbing System, Alisply Walls, CL Shoring, AR Shoring, Multiform and Alisply Circular.
Worth noting is the large number of climbing formwork systems and Alisply Circular panels, as well as the volume of 8000 m3 of shoring system.
Related Projects:
https://www.alsina.com/en/projects/circular-tanks-of-the-sewage-treatment-plant-trento-3/
https://www.alsina.com/en/projects/bello-wastewater-treatment-plant/
https://www.alsina.com/en/projects/elevated-reservatory-of-palheiros-village/
https://www.alsina.com/en/projects/everglades-water-complex/
ALSINA SYSTEMS
RELATED PROJECTS
+34 935 753 000
CamĆ de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)