Industrial WWTP FIT
The Industrial WWTP (Waste Water Treatment Plant) Fit – Fomento da Indústria do Tomate, in Marateca is based on a major expansion of their facilities in order to significantly increase their large-scale production capacity.
One of the unique features of this project was based on the client’s request to carry out the work in a fairly tight time frame. Thanks to the studies and technical solutions developed by the Alsina technical department, we were able to overcome the challenge and finish its construction in only three months.
The systems used to implement these solutions were mainly Alisply Circular for the execution of the different curved walls that the project required, in addition to the Alisply Walls system and the C160 Climbing System to carry out work at heights.
After completing the work on time, the client was very satisfied with the technical solutions and the service provided by Alsina.