Scroll Top

Oil refinery expansion

1
We has executed various projects related to industry and energy sectors

Alsina participated in the construction of an oil refinery expansion in Spain.

The structure consists of three floors of 2407 m2 with tegular beams and a slab of 20 cm. On the first floor we had to save some 1.5 meters high forged low walls that were constantly varying the shore systems dimensions and placement. We have approximately 8425 m3 of shoring systems in each floor.

The beams formwork has been done and we have used a wood formwork system on them in order to have the slabs formwork done as well. For the second forging on the outer perimeter we have used the c-160 climbing system, because due to the placement of some generators, we have to clear the bottom space in the area.

Project Details
Place:
Cartagena, Spain
Category:
Industry and Energy
Products:
CL Shoring System, C160 Climbing System, Alisply Walls, Alisply Universal

ALSINA SYSTEMS

C-160 Climbing System
Alisply Walls
CL Shoring
Alisply Universal

RELATED PROJECTS

Clear Filters
Atlantic Sapphire Salmon food industry plant
Atlantic Sapphire Salmon food industry plant

Alsina USA participated in the construction of a food industry plant that consists of large salmon farms in Homestead city (Miami)

Industrial silos in Torres Vedras
Industrial silos in Torres Vedras

Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon

Industrial flour mill in Philippines
Industrial flour mill in Philippines

Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales

La Paloma Biomethanisation Plant
La Paloma Biomethanisation Plant

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Contact
1
need help? call us!

+34 935 753 000

Pol. Ind. Pla d’en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac (Barcelona)

    Title:

    *Required fields