ALSINA ITALY PARTICIPATES IN THE CONSTRUCTION OF ROAD CIRCONVALLAZIONE SAN VITO AL TAGLIAMENTO

Outstanding Projects · Transportation

ALSINA ITALY SUPPLIES ITS SPECIAL SOLUTIONS FOR THE EXECUTION OF ROAD CIRCONVALLAZIONE SAN VITO AL TAGLIAMENTO

The project: road infrastructure in Italy

Alsina Italy subsidiary in Italy has begun in 2019 its collaboration in the construction of a new bypass in San Vito Al Tagliamento, in the Italian province of Pordenone, which will allow to distribute and better displace the traffic of the city.

The construction of this road infrastructure, which will be completed this year 2019, consists of the construction of a viaduct for which Alsina has supplied the necessary formwork for the implementation of the columns with variable section.

Taking into account the geometry of the columns, Alsina´s technicians stripped the formwork after 5 days and then designed special pieces to implement the upper part of the columns adapted to the project considering a rubber matrix of variable thickness on almost all sides of the column, with a concrete pressure of 60 kN/m.

Alsina: effective and safe formwork solutions for civils engineering.

Alsina has mainly supplied its Alisply Walls system for the implementation of the project, besides having designed the special pieces to run the upper part of the viaduct piles.

The modular formwork system Alisply Walls is a resistant, versatile and compatible system regarding its accessories with each of Alisly’s family systems, which makes the equipment use very profitable on the jobsite. The Alisply’s formwork system surface is phenolic, so it offers multiple advantages over metallic surfaces, such as lower weight, higher quality of concrete, increased performance and greater resistance to inclement weather.

Location: San Vito Al Tagliamento, Italy
Completion date: 2019