Alsina participates in the construction of an overpass in the city of Radom (Poland)

Outstanding Projects · Transportation

Alsina participates in the construction of an overpass in the city of Radom (Poland)

The project: transport infrastructure in Radom

Alsina’s polish subsidiary participated during the year 2016 in the construction of section 1 of an overpass that is part of the S7 road in the city of Radom.

The construction of this overpass, which is 80 linear meters long, and has two lanes in each direction, is part of a road project connecting the city of Radom with the city of Kielce.

The project’s implementation, which lasted a year, was made with Alsina’s standard formwork elements, without the need to design any special piece due to their great versatility and compatibility with the rest of Alsina systems.

Alsina: effective and safe formwork solutions for civil works

For the implementation of the project, Alsina supplied several of its formwork systems, such as Multiform, Alisply, AR-80 Shoring system, CL-40 shoring system and HEB beams.

Alsina’s Multiform system, consisting of double UPN metal beams, wooden beams, strips and turnbuckles is one of Alsina’s most versatile systems, allowing “ad hoc” design of the necessary recoverable formwork to adapt to any geometry whether they are straight, curved or one sided walls, lintels or bridge boards.

On the other hand, Alsina’s AR-80 shoring system is a very versatile and easy to assemble reliable support system for slab formwork implementation, consisting of vertical support elements and a system of multidirectional connections that allows providing support for both independent towers and fixed scaffolding, depending on application requirements, and annex auxiliary elements such as access stairs or safety platforms to it. This is a really strong multidirectional system, with a bearing capacity of 17.984 lbf per support, which allows shoring any structural element in civil engineering projects.

Location:  Poland

Date of completion: 2016