Bridge Avenida Kevin Ángel (Colombia)

Outstanding Projects · Transportation

Bridge Avenida Kevin Ángel (Colombia)

On January 19 opened to traffic on the new bridge of Calle 20 and Avenida Kevin Angel Manizales (Colombia) where Alsina was present with Multiform and AR-80 Shoring systems. This project, which lasted six months, is framed within the large infrastructure projects in the Colombian city which will improve mobility and visibility in this sector of the city.Technically, it is a post-tensioned bridge of two lights 57 m in length (and total track length 160 m) with a width of 7.90 m.

Alsina made available to the project management system Shoring AR-80 and Multiform enforcement system slab bridge. The Multiform system allowed the process of stripping prove very agile and safe at all times, which served to construction management remain fully satisfied with Alsina equipment used.

Location: Manizares, Colombia
Completion date: 2015