Flour Tanks
Bell located in Rovigo, in the north-east of Italy, the work consists of two main buildings (a deposit for cereal and a warehouse for grain cleaning), and a secondary buildings (another warehouse and a building for the warehouse grain).
The two main buildings, adjacent sono, measuring 35 meters high, with a staff of 750 cadauno mq. Both empezan atmosphere for 8 m high, and then rise with a unique structure consisting of 30 square alveoli.
Due to the need for concreting all the cells at once, with concreted 3 meters high, it has been handed a agran amount of Alisply walls outside MF Climb to the entire building, and climbs inside each cell.
A special unit has been designed to ecnofrar corners of the alveoli (120 corners), which had a dull way.
For other buildings, it was delivered formwork CL-40 for the highest floors, and wrought Alumecano for others.
ALSINA SYSTEMS
RELATED PROJECTS

Alsina has successfully completed their contribution as provider in the construction of the Sewage Treatment Plant of the Cerro Verde Mining Project in Arequipa

Located in the south of Lima (Peru), the Textile Factory building is a project of great importance to the province of Lima

Alsina participated in the construction of an oil refinery expansion in Spain.

Alsina participated in the construction of two main buildings a deposit for cereal and a warehouse for grain cleaning in Italy

Alsina participated in the construction of La Paloma Biomethanisation Plant in Spain

Alsina’s Formwork delegation in the Philippines participated in the construction of the Subic flour mill in the city of Zambales

Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon

Alsina USA participated in the construction of a food industry plant that consists of large salmon farms in Homestead city (Miami)

Coffrages Alsina au Maroc a collaboré dans la construction d’une usine textile à Marrakech.
(+212) 522 534 854
étage N 31, Maarif – Casablanca