Scroll Top

Multiform BOB

1
Option for the construction of bridge slabs on pre-fabricated beams

System for the execution of in situ slabs on pre-fabricated beam bridges. Thanks to its hanger system, it is possible to suspend the Multiform system both in the central spans of the deck and in the overhangs.

JUNIOR - horizontales 1

Are you looking for a solution for your slabs? Contact us to discuss further!

CONTACT

IMAGES

DOWNLOADS

Properties

  • Hanger parts enable the Multiform system to be suspended directly through Dywidag tie bars.
  • Multiform system to carry out different spans; thanks to its versatility, dimensions and sizes, it can be adapted to any shape.
  • Formwork descent system from the executed deck is one of the safest on the market.

Frequent uses

  • Execution of in situ slabs on pre-fabricated beam bridges.

COMPONENTS AND ACCESSORIES

  • Hangers (45 and 90 degrees).
  • Multiform System.
  • Special parts for Multiform and Vistaform system couplings.

Projects

Clear Filters
False tunnel in Rzeszów
False tunnel in Rzeszów

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)

Industrial silos in Torres Vedras
Industrial silos in Torres Vedras

Soluções De Cofragem Alsina, Lda, Alsina’s subsidiary in Portugal, collaborated in the construction of industrial silos in Lisbon

Barcelona’s Port Extension
Barcelona’s Port Extension

Alsina collaborated in the construction of a submerged mooring at ​​the Civil Guard area in the Port of Barcelona.

Planned city “Nueva Ciudad de Olmos” in Peru
Planned city “Nueva Ciudad de Olmos” in Peru

Alsina’s Formwork delegation in Peru collaborated in the construction of a planned city in Peru, through the execution of the 4 elevated water tanks.

Contact
1
need help? cONTACT YOUR LOCAL AGENT!

    Title:

    *Required fields