New Ganga Bridge Project
Prestigious project consisting of the construction of a 6-lane bridge over the Ganes River that connects the NH-30 near Kachhi Dargah (Patna) with the NH-103 near Bidupur (Vaishali).
Alsina has supplied AR-65 Shoring and Multiform for the execution of 3 bridge sections. These sections are 11.5 meters high in which 9,500 meters3 of shoring and 1,200 m2 of multiform system for bridges decks have been used. In total, 600 tons of formwork have been supplied and 33 sections will be executed in this structure.
AR Shoring system has a load capacity of 80 kN per support and allows shoring for surfaces with complex shapes, such as inclined slabs, semi-spherical domes or adjusted surfaces.
Multiform for bridge decks is a highly versatile modular system which, through the use and connection of standard parts, adapts to vastly different shapes thanks to its flexible configuration capacity guided by the corresponding technical study.