Bolívar – Cerrejón Port
It is the most important coal mining station in Latin America and one of the world’s largest. Its navigation channel is 19 meters deep, 225 meters wide and 4 kilometers long. It also has a supply pier to house ships of up to 30.000 tonnes, with machinery, spare parts, fuels and other materials used in mining. For this project Alsina designed a special mold for the hexapod.
For this project, we were tasked with creating the moldings to build the prefabricated 6 m3 Accropodes.
This kind of formwork is a special metallic formwork which suits every project’s needs. The formwork is intended for prefabricated parts and is able to adapt to any shape, be them cubic blocks, cubipods, edge slabs, tetrapods,… Our formworks for prefabricated are designed to achieve high performance yields while striving for speed in tasks related to setting up or dismounting formworks and keeping workplace safety.