UTE La Aldea Project
Alsina will end later this year its collaboration with the customer UTE FCC / OHL / Sotocol in the construction of the road linking Las Palmas with the town of La Aldea. The project includes the construction of a false tunnel, for which Alsina has supplied its formwork systems and engineering solutions.
This project will connect the capital of the island with the east area, allowing the transport of goods and people on a road that until now was extremely narrow and winding.
Alsina, effective solutions for tunnel construction
Alsina Formwork has supplied its False Tunnel formwork system, composed of the AR-80 Shoring-system as a support, and the Multiform system connecting and supporting the circular vault formwork implemented with the Alisply Circular system, in addition to the Alisply Heavy Walls system for the implementation of the gable ends of this 16 linear meters false tunnel with 8 meters radius in the tunnel mouth. Alsina has provided 4 formwork modules for the vault’s shuttering.
Since this solution had already been designed a long time ago to solve these types of works with Alsina’s standard material, it has not been necessary to customize any product to suit the project, enabling the customer to benefit from Alsina’s engineering applied to building in a simple and effective way.
Alsina, adding solutions
Regarding the challenges of the project it is worth mentioning that the access to the job-site is very limited, and therefore, all systems have had to be mounted “in situ”: this has been solved using Alsina standard systems, which are easily transportable and whose assembly does not require highly qualified personnel.
On the other hand, it also noteworthy that versatility in the assembly process and the use of Alsina’s false tunnel system has significantly cut formwork usage times on site. In fact, the client was so happy with the standard solution for rent that decided to extend the equipment hired to perform the tunnel gable ends in less time.
ALSINA SYSTEMS
RELATED PROJECTS

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)

Alsina’s subsidiary in Morocco collaborated in the works of the Casa Kenitra railway.

Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.

Subway Line 2 in Panama City is 21 km long and it covers the east – west route of the city.

Alsina worked with the Conlínea 2 Consortium in the related works of the tunnel of La Línea (Colombia).

Alsina collaborated in the construction of the road linking Las Palmas with the town of La Aldea.

Alsina Uruguay collaborated in the execution of a new viaduct over the Rambla Portuaria in Uruguay.

Costruzione del Ponte veicolare Costa Verde, tratto Rafael Escardo, situato nel distretto di Chorillos (Lima).

Alsina Formwork collaborated in the construction of the A-33 Highway section way between Jumilla and Yecla in Spain.

Soluzioni Alsina per la galleria del Metro nei Paesi Baschi

Alsina Italia ha partecipato alla realizzazione della linea ferroviaria Arcisate-Stabio

La Filiale di Alsina in Asia ha portato a termine la sua collaborazione nella costruzione di una importante autostrada in indonesia.

E’ stata inaugurata la nuova circonvallazione di San Vito al Tagliamento (PN)

Costruzioni di un ponte veicolare sul fiume Gange, e una strada integrata di collegamento nello stato di Bihar.
+39 039 6892179
20872 Cornate d’Adda (MB) (Italia)