Oil refinery expansion
Alsina participated in the construction of an oil refinery expansion in Spain.
The structure consists of three floors of 2407 m2 with tegular beams and a slab of 20 cm. On the first floor we had to save some 1.5 meters high forged low walls that were constantly varying the shore systems dimensions and placement. We have approximately 8425 m3 of shoring systems in each floor.
The beams formwork has been done and we have used a wood formwork system on them in order to have the slabs formwork done as well. For the second forging on the outer perimeter we have used the c-160 climbing system, because due to the placement of some generators, we have to clear the bottom space in the area.
ALSINA SYSTEMS
RELATED PROJECTS
(+48) 519 517 150
Chelmek 32-660