Scroll Top

Santolea Dam

1
Dams and Pipelines
WE accumulate experience of more than 500 water infrastructures projects worldwide.

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m. To carry out such a large project, it is calculated that a total of 65,000 m3 of roller compact concrete will be needed.

The Alsina technical office, Alsitec has designed a solution for progressively implementing the dam project, by using steps that are 1.20 m high with an upstream and downstream depth of 24 cm and 72 cm respectively. The working rate of the project was defined in laying small layers of compact concrete 30 cm high continuously, day and night, until the crown was reached.

The main formwork system that Alsina has chosen to implement this project is the Alisply Walls joined to the Vertical Multiform system. The versatile nature of both systems makes it possible to overcome the geometrical differences considered in the project, thanks to significant adaptation efforts on behalf of the Alsina technicians.

Project Details
Place:
Teruel, Spain
Category:
Dams and Pipelines
Products:
Multiform Vertical, Site Stair Tower, Reinforced Scaffold, C240 Climbing System, C160 Climbing System, Alisply Walls, Steel Columns, CL Shoring System, Vistaform Slabs, Alisply Circular Walls

ALSINA SYSTEMS

RELATED PROJECTS

Clear Filters
Santolea Dam
Santolea Dam

The final height of the tail dam is 50 m, and its length along the crown is approximately 190 m.

Andra Pradesh Dam
Andra Pradesh Dam

Alsina India is participating in the construction of a hydraulic project in the state of Andhra Pradesh (India).

Vizcachas Dam
Vizcachas Dam

The Alsina delegation in Peru collaborated in the construction of the Vizcachas Dam, in the Quellaveco mining project in Peru.

Contact
1
Potrzebujesz pomocy? Zadzwoń do nas!

(+48) 519 517 150

Pl. Kilinskiego 1
Chelmek 32-660

    Zawód:

    *Wymagane pola