Tunnels and Bridges
WE HAVE high-resolution capability to effectively address the needs of all our customers.

Alsina Italy has successfully participated in the construction of the Arcisate-Stabio railway line, a new railway line that will connect Switzerland to Malpensa airport (Italy).

Once again Alsina’s engineering department has been able to provide an ideal solution to build such a complex structure. The directions given by the construction management regarding performance, safety and different phases of the project have been successfully fulfilled by the Alsina Italy team.

With a length of 8 km, the new railway is made up of railway trenches and tunnel pieces: in particular, Alsina has contributed to Gladden station, on the border between Italy and Switzerland, the building of the GA03 tunnel to Induno Olona, all the water traps and several retaining walls along the route.

More specifically, the Alsina equipment has made it possible to resolve the countless technical difficulties of the GA03 tunnel Induno Olona, ​​which is 60 meters long. The Alsina equipment made it possible to meet the high production rates required by the customer. With the AR-80 Shoring System it was possible to support the trusses that allow the continuous circulation of means of transport in its lower part, and it was resolved with the Multiform Bridges System by the particular shape of the vault.

The Multiform system, consisting of double UPN metal beams and wooden beams, is one of Alsina’s most versatile systems, allowing “ad hoc” design of any type of recoverable formwork to implement slab, piles and pillars formwork of all geometries, as well as straight walls, curved walls, one-side walls, bridge decks and climbing elements.

Finally, formwork stripping was carried out using manual lathes operated from above the formwork structure. This allowed very fast recovery, providing total safety for the workers during this procedure.

Gladden station has got a slab of approximately 1,000 square meters 1 m thick, and 8 meters high from the ground. This template was carried out with the CL-40 Shoring System, with a technical solution optimized to suit the customer’s budget.

The timely completion of the project, the technical optimization of the system and the constant presence and support of Alsina have allowed our customers to meet the pre-set production and safety goals.

Project Details
Place:
 Italia
Category:
Tunnels and Bridges
Products:
Multiform Bridges, AR Shoring System, CL Shoring System, Vistaform Slabs

ALSINA SYSTEMS

Cimbre AR
Cimbre CL
Multiform para pontes
Vistaform

RELATED PROJECTS

Clear Filters
Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

Spanish High-Speed Railway line
Spanish High-Speed Railway line

Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.

Subway Line 2
Subway Line 2

Subway Line 2 in Panama City is 21 km long and it covers the east – west route of the city.

Tunnel of la Línea
Tunnel of la Línea

Alsina worked with the Conlínea 2 Consortium in the related works of the tunnel of La Línea (Colombia).

Contact
1
Necessita de ajuda? Ligue-nos!

(+351) 219 172 535

Rua Pé De Mouro, Ultimo Armazém
2710 -144 Sintra (Portugal)

    Posição:

    *Os campos obrigatórios