false tunnel in Rzeszów

1
Tunnels and Bridges
WE HAVE high-resolution capability to effectively address the needs of all our customers.

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland) in order to carry out a pedestrian passageway for the local community under a highway.

The construction was carried out on a plot with a 4% inclination and was implemented by using a just 5 stepping process of the Alsina’s Alisply Circular system, which had a very positive impact on the client’s impression and their experience with the system and formwork process created by Alsina.

Alsina: safe and effective formwork solutions for civil works

For the implementation of the project, Alsina supplied its Alisply Vaults system,  Multiform formwork system and AR-80 Shoring system.

Circular Alisply Vaults system allows the perfect adaptation to the geometry of the vault with a 2.5 meters radius. This system of circular walls adapted to form vaults is resistant, versatile and compatible with the MultiForm family, which allows equipment’s high profitability at the job site. Alisply system has a phenolic surface, so it offers multiple advantages over metallic surfaces, such as lower weight, higher quality of concrete, increased performance and greater resistance to inclement weather.

On the other hand, Alsina’s Multiform system, consisting of double UPN metal beams, wooden beams, strips and turnbuckles is one of Alsina’s most versatile systems, allowing “ad hoc” design of the necessary recoverable formwork to adapt to any geometry whether they are straight, curved or one sided walls, lintels or bridge boards.

Project Details
Place:
 Poland
Category:
Tunnels and Bridges
Products:
Multiform Vertical, Alisply Circular Walls, AR Shoring

ALSINA SYSTEMS

Alisply Circular
Multiform Vertical
Cimbre AR

RELATED PROJECTS

Clear Filters
Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

Spanish High-Speed Railway line
Spanish High-Speed Railway line

Alsina’s Formwork collaborated in the construction of the Vilariño – Campobecerros high-speed train line sub-section in Spain.

Subway Line 2
Subway Line 2

Subway Line 2 in Panama City is 21 km long and it covers the east – west route of the city.

Tunnel of la Línea
Tunnel of la Línea

Alsina worked with the Conlínea 2 Consortium in the related works of the tunnel of La Línea (Colombia).

Contact
1
Necessita de ajuda? Ligue-nos!

(+351) 219 172 535

Rua Pé De Mouro, Ultimo Armazém
2710 -144 Sintra (Portugal)

    Posição:

    *Os campos obrigatórios