Sewage Treatment Plant Thomas P. Smith

1
Water Treatment
WE accumulate experience of more than 500 water infrastructures projects worldwide.

Alsina Forms participate in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States.

Coordinated work with our Chicago and Miami teams has made this project a success. Two large clarifiers 27.4 meters in diameter and 12.8 meters high were constructed with two pours from heights of 6 meters and 6.7 meters, using the Alisply Circular System and the C-240 Climbing Platform System.

The project has some special requirements as the concrete corbels in the inside wall that will be holding a steel roof structure and machinery as well as the impossibility of using a tall crane because of the proximity to the city’s international airport.

Project Details
Place:
Florida, USA
Category:
Water Treatment
Products:
Alisply Circular, CL Shoring System, C240 Climbing System

ALSINA SYSTEMS

Sistema Trepante C-240
Alisply Circular
Cimbre CL

RELATED PROJECTS

Torre de Águas Outeiro
Torre de Águas Outeiro

A Alsina Portugal levou a cabo a execução de vários depósitos que apresentou uma grande dificuldade técnica devido à forma hiperboloide de revolução.

Sewage Treatment Plant Thomas P. Smith
Sewage Treatment Plant Thomas P. Smith

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Valenzuela wastewater treatment plant
Valenzuela wastewater treatment plant

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

Contact
1
Necessita de ajuda? Ligue-nos!

(+351) 219 172 535

Rua Pé De Mouro, Ultimo Armazém
2710 -180 Sintra (Portugal)

    Posição:

    *Os campos obrigatórios