Waste Treatment Plant
The plant consists of several buildings and large facilities, including the waste collection pits, a three-line processing plant, two biomethanisation digesters, an incinerator and a grinding turbine.
The plant consists of several buildings and large facilities, including the waste collection pits, a three-line processing plant, two biomethanisation digesters, an incinerator and a grinding turbine. The main building of the plant has a maximum height of 21 m, built using the C-160 climbing platform. A large number of Site Stairways were installed in this structure at great height to make it easier to change between building levels.
A large amount of CL-40 Shoring System was used in this building for making slabs at height. Also important are the digesters made using Alisply Curve, with a maximum height of 25 m, using the C-240 Climbing Platform. During the project, Alsina fully complied with the demanding safety requirements