Scroll Top

Valenzuela wastewater treatment plant

1
Water Treatment
WE accumulate experience of more than 500 water infrastructures projects worldwide.

Alsina’s Formwork delegation in in the Philippines participated in the construction of the Wastewater Treatment Plant of the city of Valenzuela, in the Philippines.

This project water infrastructure, which is currently underway and will provide drinking water to the entire city of Valenzuela, involves the construction of a large circular radial walls watertight tank with three stories and good finish on the walls and joints.

Alsina: versatile and profitable solutions for the construction of water infrastructures

For the implementation of the project Alsina has supplied its Alisply Walls and Alisply Circular Walls formwork systems, as well as its C-160 Climbing system, with no need to design any customized element due to the versatility of these formwork systems.

Alisply Walls modular formwork system is a resistant, versatile and compatible system regarding its accessories with each of Alisly’s family systems, which makes the equipment use very profitable on the jobsite. The Alisply’s formwork system surface is phenolic, so it offers multiple advantages over metallic surfaces, such as lower weight, higher quality of concrete, increased performance and greater resistance to inclement weather.

On the other hand, Alisply Circular Walls is a recoverable modular formwork system for circular fair-faced concrete walls. This is a fast and profitable system to be handled with a crane and consisting of a galvanized steel frame and phenolic resin-coated plywood surface. Its modules come preassembled from the workshop and only the radius has to be defined on site. In order to do this, the panel includes all the necessary components and no special tool is required to curve the phenolic plywood.

Finally, Alsina’s C-160 Climbing system allows piles and walls of climbing cycles with pouring heights of up to 4 meters, to be formed with total safety for the operators. The assembly of the climbing platform and its safety platform can be carried out on the ground, before positioning it on the wall or pile, or by placing the platforms in the anchorage rings and assembling the platform later. It can be set using either Alisply (straight and radius walls) or Vistaform and Multiform formwork systems, making it a very versatile but also safe system.

Project Details
Place:
Valenzuela, Philippines
Category:
Water Treatment
Products:
Alisply Walls, Alisply Circular, C-160 Climbing System

ALSINA SYSTEMS

Sistemul Cățărător C-160
Alisply Circular
Pereți Alisply

RELATED PROJECTS

Clear Filters
Waste Treatment Plant
Waste Treatment Plant

Waste Treatment Plant in France

Water Tower Outeiro
Water Tower Outeiro

Alsina Portugal implemented the execution of several deposits,which involved a great technical difficulty due its revolution’s hyperboloid shape.

Sewage Treatment Plant Thomas P. Smith
Sewage Treatment Plant Thomas P. Smith

Alsina participated in the construction of one of the largest wastewater Treatment Plants being built up currently in the United States

Maldonado Wastewater Treatment Plant
Maldonado Wastewater Treatment Plant

Alsina collaborated with the customer UTE OAS-CIEMSA in building the Wastewater Treatment Plant located Uruguay.

Contact
1
Aveți nevoie de ajutor? Contactați-ne!

(+40) 0217954671

Soseaua Giurgiului nr.1
Comuna Ghimpați
Judetul Giurgiu

    Poziţie:

    *Câmpuri obligatorii