Scroll Top

Cebu-Cordova Highway Link. Philippines

Cebu Highway Link

1
TUNNELS AND BRIDGES
WE HAVE HIGH-RESOLUTION CAPABILITY TO EFFECTIVELY ADDRESS THE NEEDS OF ALL OUR CUSTOMERS

It is an 8.5 km long viaduct that will link the islands of Cebu and Cordova (Philippines). The work has been promoted by the Metro Pacific Tollways, the Cebu city council and the Córdoba city council.

The project consists of a 612 m cable-stayed bridge as the central structure, with a main span of almost 400 meters of span between piers. It also includes two approach viaducts that will be built with precast beams for a total of 2,185 meters.

For the realization of these viaducts, 440 prefabricated beams are needed which will add up to a length of 15,762 meters.

The main benefit of this new infrastructure is that it will mean a new connection between the industrial area of ​​Cebu and the Mactan International Airport, connecting with the urban developments of Cordova, located on the same island, thus constituting a backbone channel and a dynamic element. for the local economy.

 

Alsina’s solution

The special solution provided by Alsina has made it possible to produce 440 units of post-tensioned concrete beams “in situ”. The beams have a variable length between 19 and 53 meters, and edges of 1.50 and 2.00 meters. The section of the beam is shaped like a double T in the central sections, and is solid at the ends with a transition section that joins the two zones.

Alsina’s engineering department designed a modular metal mold system with integrated mechanical plumbing and stripping systems; as well as work platforms with built-in security systems.

4 sets of modular solutions were delivered to make up to 200 linear meters of precast beams “in situ” every day, meeting the client’s production targets (4 beams per day).

The results obtained are prefabricated beams “km 0”, together with their final location that avoid large heavy and special transports with polluting boats or vehicles. Therefore, it is a sustainable and economical solution aligned with the standards of the ecological agendas of the countries and the construction sector in particular.

 

More information:

https://www.alsina.com/en/products/slab-formwork/modular-system-for-prefabricated-beams/

Project Details
Place:
Philippines
Category:
Tunnels and Bridges
Products:
Prefabricated Beams

ALSINA SYSTEMS

Modular system for prefabricated Beams

RELATED PROJECTS

Clear Filters
Toll road in Southeast Asia
Toll road in Southeast Asia

Alsina’s Formwork delegation in Asia collaborated in the construction of a major toll road in Southeast Asia.

False tunnel in Rzeszów
False tunnel in Rzeszów

Alsina’s Formwork Polish subsidiary participated in the construction of a false tunnel in the city of Rzeszów (Poland)

Railway Project
Railway Project

Alsina’s subsidiary in Morocco collaborated in the works of the Casa Kenitra railway.

Arcisate-Stabio railway
Arcisate-Stabio railway

Alsina Italy has participated in the construction of the Arcisate-Stabio railway line that will connect Switzerland to Malpensa airport.

Contact
1
need help? call us!

(+632) 834 7553

Unit 1515 & 1516, High Street South Corporate Plaza Tower 1.
26th Street, Bonifacio Global City,
Taguig City, 1634 Philippines

    Title:

    *Required fields